Projects completed
CONSTRUCTION OF THE RAILWAY INFRASTRUCTURE
Construction of the units no. 5 and 6 in the Opole Power Plant. Track works – Opole...
ELECTRICAL, MEASUREMENT AND CONTROL EQUIPMENT AND AUTOMATION WORKS
Execution of electrical, measurement and control equipment and automation works within...
COMPREHENSIVE CONSTRUCTION OF TANKS
Comprehensive execution as a General Contractor of the reconstruction of two tanks for...
EXTENSION OF THE PROPELLANT AND GREASE DEPOT IN THE NAVAL PORT IN GDYNIA
Reconstruction and extension of the Propellant and Grease Depot in the Naval Port in...
CONSTRUCTION OF THE OIL TERMINAL
Construction of the Oil Terminal in Gdańsk. Commissioning party: PERN SA. PROJECT...
HORIZONTAL DIRECTIONAL DRILLING
Making the horizontal directional drilling under the river of Rządza for the ‘Przyjaźń’...
CONSTRUCTION OF THE COLLECTION AND STORAGE STATION
Construction of a technological waste collection and storage station at the sewage...
INSTALLATION OF THE LANDING LIGHTS
Installation of the landing lights in the geometrical system of ALPA-ATA CAT II and PAPI...
CONSTRUCTION OF THE ŁÓDŹ CHOJNY PUMP STATION
Modernisation of the pressure technological network conduits and their measuring system...
EXTENSION OF THE FUEL PIPELINE
Extension of the fuel supply system – fuel pipeline with infrastructure’ task no. 2...
CONSTRUCTION AND EXTENSION OF THE PROPELLANT AND GREASE DEPOT 1 AND THE PROPELLANT AND GREASE DEPOT 2
Construction and extension of the Propellant and Grease Airport Depots no. 1 and 2 at...
EXTENSION OF THE BRANCH LINE
Extension of the branch line at TP no. 74 in Ostrów Wielkopolski. Commissioning party:...